USA Banner

Official US Government Icon

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

Secure Site Icon

Secure .gov websites use HTTPS
A lock ( ) or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

Portions of this site may be affected due to a lapse in appropriations and associated shutdown/furloughs. Please monitor this page for updates on site availability and operating status.

ROUTE 66/FIFTH STREET COMPLETE STREETS IMPROVEMENTS

All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.

In Progress

ENVIRONMENTAL REVIEW AND PERMITTING STATUS
IN PROGRESS

icon_calendar

ESTIMATED COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
10/07/2027

0 out of 1

ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED

Surface Transportation

SECTOR
Surface Transportation

Project Category

CATEGORY
Project Category DOT Projects

Caltrans

LEAD AGENCY
California, CalTrans

Description:

The purpose of this project is to improve accessibility and connectivity to essential community destinations within the project limits for the community adjacent to SR-66. The project would also support the livability and vitality of the community through improvements in non-motorist safety, mobility, and comfort by reducing vehicle speeds or volumes. The deficiencies within this segment of SR-66 include uneven broken sidewalks, overgrown landscaped strips near sidewalks, multiple driveways that contribute to uneven sidewalks, above ground utilities within the sidewalks reducing the width in some locations. Within the project limits, some curb ramps are not in compliance with current standards and basic crosswalks do not provide optimal pedestrian visibility. Currently, there are no bicycle facilities within the project limits and bicyclists traveling through must share the travel lane with moving traffic including trucks. Uninviting conditions for bicyclists on the road can lead to riding on sidewalks and potential conflict with pedestrians. The project is needed to improve bicycle and pedestrian connectivity and the level of comfort for all users on SR-66 which functions as an important neighborhood corridor within a disadvantaged community.

Permitting Timetable

The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.

  • For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Loading ...
Overall Project Timetable
 
STATUS
Schedule
Extension or Delay
Ahead of Schedule
Paused
No End Date
Planned

Action Information

For additional information, please select an Action from the Permitting Timetable above.

  • Action:  
  • Responsible Agency:  
  • Bureau:  
  • Action Status:  
  • SHPO:  
  • Action Identifier:  
  • Action Outcome:  
Milestone Original Target Date Current Target Date Milestone Complete