SB 62 CONSTRUCT CONCRETE/RSP APRONS
All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.
ENVIRONMENTAL REVIEW AND PERMITTING STATUS
COMPLETE
COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
02/24/2020
ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED
SECTOR
Surface Transportation
CATEGORY
Project Category
DOT Projects
LEAD AGENCY
California, CalTrans
Description:
The California Department of Transportation (Caltrans) proposes a restoration project of storm-eroded embankment on State Route (SR) 62 between postmile (P.M.) 124.0 and 142.0 in San Bernardino County.
The project will construct concrete/rock slope protection systems (RSP) at 10 desert wash locations. This protection system starts at the edge of traveled way and consists of a plain concrete slab for drainage purposes and a non-erodible concreted rock side slope. The approximate dimensions of these RSPs are 200 feet long by 80 feet wide. In addition, the installation of rumble strips along the concrete slab will alert drivers against running-off the road.
To view timetable chart, please turn device sideways (landscape)
Permitting Timetable
The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.
- For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Action Information
For additional information, please select an Action from the Permitting Timetable above.
- Action:
- Responsible Agency:
- Bureau:
- Action Status:
- SHPO:
- Action Identifier:
- Action Outcome:
| Milestone | Original Target Date | Current Target Date | Milestone Complete |
|---|