SBd 215 University Parkway IC;RECONFIGURE EXISTING IC & RAMP
All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.
ENVIRONMENTAL REVIEW AND PERMITTING STATUS
CLASS OF ACTION CHANGED
ESTIMATED COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
N/A
ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED
SECTOR
Surface Transportation
CATEGORY
Project Category
DOT Projects
LEAD AGENCY
California, CalTrans
Description:
The California Department of Transportation (Caltrans) in cooperation with the San Bernardino County Transportation Authority (SBCTA), and the City of San Bernardino (City), is proposing to improve the Interstate 215 (I-215)/University Parkway Interchange in the City of San Bernardino, California.
The proposed I-215 University Parkway Interchange Improvement Project (Project) is intended to provide operational improvements to traffic flow within the Project limits. SBCTA proposes to replace the existing University Parkway tight diamond interchange configuration with a Diverging Diamond Interchange (DDI) configuration. The existing undercrossing would remain in place. This concept would improve all four legs of the current interchange and would improve directional movement through the system. Using the DDI system, the interchange would allow more efficient left-turn and right-turn movements at all ramp terminals. The Project limits are located within Caltrans and City right-of-way (ROW). The areas within and immediately adjacent to the Project limits are predominately developed and generally consist of commercial/retail land serves as a main point of access for students, faculty, and visitors of California State University, San Bernardino (CSUSB).
To view timetable chart, please turn device sideways (landscape)
Permitting Timetable
The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.
- For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Action Information
For additional information, please select an Action from the Permitting Timetable above.
- Action:
- Responsible Agency:
- Bureau:
- Action Status:
- SHPO:
- Action Identifier:
- Action Outcome:
Milestone | Original Target Date | Current Target Date | Milestone Complete |
---|