Seldovia Bay Ferry Dock Refurbishment Project
All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.
ENVIRONMENTAL REVIEW AND PERMITTING STATUS
CLASS OF ACTION CHANGED
ESTIMATED COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
N/A
ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED
SECTOR
Surface Transportation
CATEGORY
Project Category
DOT Projects

LEAD AGENCY
Department of Transportation, Federal Transit Administration
Description:
The Seldovia Bay Ferry Dock Refurbishment Project proposed by Seldovia Village Tribe would relocate the existing floating ferry dock in the City of Seldovia, Alaska approximately 40 feet closer to the shoreline, and rotate it approximately 90 degrees. This reconfiguration would lessen the impact of northerly wave swells on the structure. The existing dock is not safe or functional for vessels or pedestrians. Since the construction of the existing dock approximately ten years ago, the piles are no longer secure and shift during wave swells. The purpose of the Project is to refurbish the existing dock to bring it into a usable, safe, and sustainable condition. Alternatives considered include a No Build and a Build Alternative.
To view timetable chart, please turn device sideways (landscape)
Permitting Timetable
The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.
- For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Action Information
For additional information, please select an Action from the Permitting Timetable above.
- Action:
- Responsible Agency:
- Bureau:
- Action Status:
- SHPO:
- Action Identifier:
- Action Outcome:
Milestone | Original Target Date | Current Target Date | Milestone Complete |
---|