SR-262 Mission Boulevard Cross Connector Project

PROJECT WEBSITE: Caltrans District 4 Projects

All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.

In Progress

ENVIRONMENTAL REVIEW AND PERMITTING STATUS
IN PROGRESS

icon_calendar

ESTIMATED COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
12/26/2026

0 out of 1

ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED

Surface Transportation

SECTOR
Surface Transportation

Project Category

CATEGORY
Project Category DOT Projects

Caltrans

LEAD AGENCY
California, CalTrans

Description:

This is an OVERSIGHT project where the local county planning agency is producing the environmental document, permits, and cultural studies. Caltrans does not monitor scheduled milestone delivery.  

The proposed project would reduce congestion and improve east-west regional connectivity between I-680 and I-880 within the (California) SR-262 (Mission Boulevard) Corridor by reconfiguring the I-680/SR-262 interchange ramps to accommodate current and future traffic patterns and by grade separating through-traffic at the Mohave Drive and Warm Springs Boulevard intersections. This project is Caltrans OVERSIGHT 

Permitting Timetable

The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.

  • For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Loading ...
Overall Project Timetable
 
STATUS
Schedule
Extension or Delay
Ahead of Schedule
Paused
No End Date
Planned

Action Information

For additional information, please select an Action from the Permitting Timetable above.

  • Action:  
  • Responsible Agency:  
  • Bureau:  
  • Action Status:  
  • SHPO:  
  • Action Identifier:  
  • Action Outcome:  
Milestone Original Target Date Current Target Date Milestone Complete