SR 30 (US 98) FROM SR 189 BEAL PKWY TO WEST END OF BROOKS BRIDGE
PROJECT WEBSITE: Around the Mound Website
All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.
ENVIRONMENTAL REVIEW AND PERMITTING STATUS
IN PROGRESS
ESTIMATED COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
06/02/2026
ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED
SECTOR
Surface Transportation
CATEGORY
Project Category
DOT Projects
LEAD AGENCY
Florida
Other Agencies with Actions or Authorizations:
Department of the Interior
Description:
This Project Development and Environment (PD&E) Study evaluates options for rerouting State Road (SR) 30 (US 98) Miracle Strip Parkway “Around the Mound” in Fort Walton Beach, Florida. The length of rerouted SR 30 (US 98) would be 0.71 miles as compared with the existing linear distance of 0.61 miles. The project limits are on US 98 from SR 189 (Beal Parkway) to West End of Brooks Bridge and North along SR 85 (Eglin Parkway) to Hollywood Boulevard
To view timetable chart, please turn device sideways (landscape)
Permitting Timetable
The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.
- For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Action Information
For additional information, please select an Action from the Permitting Timetable above.
- Action:
- Responsible Agency:
- Bureau:
- Action Status:
- SHPO:
- Action Identifier:
- Action Outcome:
| Milestone | Original Target Date | Current Target Date | Milestone Complete |
|---|