SR 70 Binney Junction Roadway Rehabilitation and Complete Streets Project
PROJECT WEBSITE: https://dot.ca.gov/caltrans-near-me/district-3/d3-projects/d3-sr-70-binney-junc…
All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.
ENVIRONMENTAL REVIEW AND PERMITTING STATUS
COMPLETE
COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
12/07/2020
ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED
SECTOR
Surface Transportation
CATEGORY
Project Category
DOT Projects
LEAD AGENCY
California, CalTrans
Other Agencies with Actions or Authorizations:
Department of the Army, US Army Corps of Engineers - Regulatory
Description:
The California Department of Transportation proposes to widen the road to five lanes, which includes two through lanes in each direction and a two way left turn lane (TWLTL), install standard shoulders and sidewalks. The proposed project is located on State Route (SR) 70 in Yuba County, California between post miles (PM) 14.8/15.7 in the northern part of the City of Marysville.These improvements will conform to three lanes at the recently constructed Simmerly Slough Bridge Project. The project will replace Marysville Underpass (UP) (Bridge No.16-18) and Binney Junction UP (Bridge No. 16-26) with new structures that meet vertical clearance standards as well as other highway standards.
To view timetable chart, please turn device sideways (landscape)
Permitting Timetable
The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.
- For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Action Information
For additional information, please select an Action from the Permitting Timetable above.
- Action:
- Responsible Agency:
- Bureau:
- Action Status:
- SHPO:
- Action Identifier:
- Action Outcome:
| Milestone | Original Target Date | Current Target Date | Milestone Complete |
|---|