SR 74 Super Elevation Corrections: Safety Lighting, Shoulder widening and OGAC Overlay.

All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.

Complete

ENVIRONMENTAL REVIEW AND PERMITTING STATUS
COMPLETE

icon_calendar

COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
05/14/2020

4 out of 4

ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED

Surface Transportation

SECTOR
Surface Transportation

Project Category

CATEGORY
Project Category DOT Projects

Caltrans

LEAD AGENCY
California, CalTrans

Other Agencies with Actions or Authorizations:

California

California

Department of the Interior

Department of the Interior, Fish and Wildlife Service

Department of the Army

Department of the Army, US Army Corps of Engineers - Regulatory

Description:

Caltrans District 12 proposes to improve a segment of State Route 74, also known as Ortega
Highway, in unincorporated Orange County from 0.8 mile west of the San Juan Hot Springs Canyon
(Post Mile [PM] 11.50) to the Orange/Riverside County line (PM 16.60), excluding the San Juan
Canyon Bridge (PM 13.28 to PM 13.33). The project is needed because SR-74 currently experiences
high cross-centerline collisions. Additionally, the segment of SR-74 within the project limits
experiences wet pavement due to the existing pavement conditions and to inefficient drainage. The
project proposes to reduce the number and severity of collisions by resurfacing the existing asphalt
concrete (AC) roadway surface with High Friction Surface Treatment (HSFT) to address wet
pavement collisions, constructing a continuous 4 ft shoulder in both directions and bringing existing
non-standard lanes to standard 12 ft lanes and providing super elevation improvements and
constructing 10 ft shoulders for acceleration/deceleration at the San Juan Fire Station.

Permitting Timetable

The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.

  • For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Loading ...
Overall Project Timetable
 
STATUS
Schedule
Extension or Delay
Ahead of Schedule
Paused
No End Date
Planned

Action Information

For additional information, please select an Action from the Permitting Timetable above.

  • Action:  
  • Responsible Agency:  
  • Bureau:  
  • Action Status:  
  • SHPO:  
  • Action Identifier:  
  • Action Outcome:  
Milestone Original Target Date Current Target Date Milestone Complete