USA Banner

Official US Government Icon

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

Secure Site Icon

Secure .gov websites use HTTPS
A lock ( ) or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

SR132 DAKOTA AVENUE TO GATES ROAD

PROJECT WEBSITE: State Route 132 Dakota Avenue to Gates Road Project

All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.

In Progress

ENVIRONMENTAL REVIEW AND PERMITTING STATUS
IN PROGRESS

icon_calendar

ESTIMATED COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
04/21/2022

3 out of 3

ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED

Surface Transportation

SECTOR
Surface Transportation

Project Category

CATEGORY
Project Category DOT Projects

Caltrans

LEAD AGENCY
California, CalTrans

Other Agencies with Actions or Authorizations:

California

California

Department of the Interior

Department of the Interior, Fish and Wildlife Service

Description:

The California Department of Transportation (Caltrans), proposes to construct an access-controlled facility (expressway) on either the existing alignment or new alignments or a freeway express/expressway on a new alignment. The project is located within the west central portion of Stanislaus County 3.1 miles east of the San Joaquin River Bridge near Gates Road/Paradise Road and 2 miles west of the City of Modesto.

The project will construct an access-controlled facility (expressway) adjacent to the existing State Route 132 (SR-132) alignment or on new SR-132 new alignment, or a freeway/expressway on new SR-132 alignment. The project is in western Stanislaus County, 3.1 miles east of the San Joaquin River Bridge, extending from the Dakota Avenue/Kansas Avenue intersection to the Gates Road/SR-132 intersection.

The project will begin at the intersection of Dakota and Kansas, then go west on Kansas and connect to Gates, or go south down Dakota and connect with the existing SR-132, and extend to SR-132 and Gates. There are two alternatives adjacent to the existing SR-132 and two alternatives adjacent to Kansas.

SR-132 has experienced an increase in traffic due to the rise in commuter traffic, which transports residents from their affordable housing in the Sn Joaquin Valley to higher-paying jobs in the Bay Area. That has resulted in congestion and an increase in collisions during the peak commute period. This project is intended to connect this stretch of SR-132 to the SR-132 West Expressway Project, which will extend from SR-99 in Modesto to Dakota and is scheduled to begin construction in Spring 2019

 

PURPOSE & NEED

This project will provide a route for improving mobility west and east through western Stanislaus County, connecting SR-99 in the City of Modesto to Interstate 5; Provide adequate capacity for the regional movement of traffic and goods; Enhance the local road network that would accommodate local agricultural traffic; Provide consistency with existing and planned local, regional and interregional transportation planning by implementing the planned transportation concept facility.

Increasing growth and traffic demand has generated existing and forecasted traffic operations deficiencies for the existing two-lane conventional highway. Also, the traffic collisions fatality rate is higher than the statewide average for a similar type of facility. The facility has several rural driveways along the highway that create more conflict movements for mainline traffic, including truck traffic

Permitting Timetable

The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.

  • For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Loading ...
Overall Project Timetable
 
STATUS
Schedule
Extension or Delay
Ahead of Schedule
Paused
No End Date
Planned

Action Information

For additional information, please select an Action from the Permitting Timetable above.

  • Action:  
  • Responsible Agency:  
  • Bureau:  
  • Action Status:  
  • SHPO:  
  • Action Identifier:  
  • Action Outcome:  
Milestone Original Target Date Current Target Date Milestone Complete