STATE ROUTE 1 (PACIFIC COAST HIGHWAY) DRAINAGE RESTORATION PROJECT AND BRIDGE REPLACEMENT AT SOLSTICE CANYON CREEK
All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.
ENVIRONMENTAL REVIEW AND PERMITTING STATUS
COMPLETE
COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
03/25/2019
ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED
SECTOR
Surface Transportation
CATEGORY
Project Category
DOT Projects
LEAD AGENCY
California, CalTrans
Other Agencies with Actions or Authorizations:
California
Description:
The California Department of Transportation (Caltrans) proposes a drainage restoration project at nineteen (19) locations on State Route 1 (Pacific Coast Highway) in the cities of Los Angeles, Malibu, and unincorporated areas within Los Angeles County (post miles 37.67 to 62.86) and Ventura County (post miles 0.00 to 0.92). The proposed improvements include repair and rehabilitation of existing drainage facilities along the route to restore full functionality, to prevent further deterioration, and ensure proper drainage in an area subject to erosion. The proposed improvements also include the replacement of the existing bridge/culvert at Solstice Canyon Creek with a new bridge structure with an underlying natural slope creek bottom to provide improved flood water conveyance, and to improve hydraulic conditions to facilitate movement of the endangered Southern steelhead trout population in the project study area.
To view timetable chart, please turn device sideways (landscape)
Permitting Timetable
The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.
- For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Action Information
For additional information, please select an Action from the Permitting Timetable above.
- Action:
- Responsible Agency:
- Bureau:
- Action Status:
- SHPO:
- Action Identifier:
- Action Outcome:
Milestone | Original Target Date | Current Target Date | Milestone Complete |
---|