State Route 1: Santa Maria River Bridge Replacement
All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.
ENVIRONMENTAL REVIEW AND PERMITTING STATUS
IN PROGRESS
ESTIMATED COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
12/15/2024
ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED
SECTOR
Surface Transportation
CATEGORY
Project Category
DOT Projects
LEAD AGENCY
California, CalTrans
Other Agencies with Actions or Authorizations:
Department of Commerce, National Oceanic and Atmospheric Administration
Department of the Interior, Fish and Wildlife Service
Department of the Army, US Army Corps of Engineers - Regulatory
California
Description:
The California Department of Transportation (Caltrans) proposes to replace the Santa Maria River Bridge (No. 49-0042) on State Route 1 (SR-1) at PM 50.3/50.6 in Santa Barbara County and at PM 0.0/0.3 in San Luis Obispo County. The Santa Maria River Bridge crosses the boundary of Santa Barbara County and San Luis Obispo County.
As mentioned, the proposed project will occur on SR-1 in both northern Santa Barbara County and southern San Luis Obispo County. The bridge is located just north of the City of Guadalupe in Santa Barbara County. The 1,200 feet long bridge was built in 1955 and was seismically retrofitted in 1998. The existing bridge sections consist of two 12-foot lanes, two 2-foot shoulders and two 32-inch wide curbs supporting metal bridge rails. Multiple bridge inspections have determined that the bridge’s structural integrity has deteriorated and action is required to protect the traveling public. Temporary access will be required for bridge work and for work in the river. Vegetation removal will also be required. Construction equipment will need to operate in the riverbed.
To view timetable chart, please turn device sideways (landscape)
Permitting Timetable
The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.
- For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Action Information
For additional information, please select an Action from the Permitting Timetable above.
- Action:
- Responsible Agency:
- Bureau:
- Action Status:
- SHPO:
- Action Identifier:
- Action Outcome:
Milestone | Original Target Date | Current Target Date | Milestone Complete |
---|