Ted Stevens Anchorage International Airport Field Maintenance Storage Yard Expansion, Environmental Assessment
PROJECT WEBSITE: http://dot.alaska.gov/creg/aia-storage-yard-expansion/
All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.
ENVIRONMENTAL REVIEW AND PERMITTING STATUS
COMPLETE
COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
02/01/2018
ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED
SECTOR
Aviation
CATEGORY
Project Category
DOT Projects
LEAD AGENCY
Department of Transportation, Federal Aviation Administration
Description:
The Alaska Department of Public Transportation & Public Facilities (DOT&PF) is proposing to expand the existing Airport Field Maintenance (AFM) Storage Yard located on the south side of Lake Hood Drive and the west side of Helio Place at the Ted Stevens Anchorage International Airport (TSAIA). The AFM Storage Yard expansion would be utilized as a storage yard for Airport operations primarily to store supplemental and backup equipment, materials for ongoing operations, and as a temporary laydown area for construction projects and for temporary materials stockpiling. The expansion would require approximately 16 acres of ground disturbance which includes 7.7 acres wetlands impacts (fill).
To view timetable chart, please turn device sideways (landscape)
Permitting Timetable
The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.
- For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Action Information
For additional information, please select an Action from the Permitting Timetable above.
- Action:
- Responsible Agency:
- Bureau:
- Action Status:
- SHPO:
- Action Identifier:
- Action Outcome:
| Milestone | Original Target Date | Current Target Date | Milestone Complete |
|---|