USA Banner

Official US Government Icon

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

Secure Site Icon

Secure .gov websites use HTTPS
A lock ( ) or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

Portions of this site may be affected due to a lapse in appropriations and associated shutdown/furloughs. Please monitor this page for updates on site availability and operating status.

Transportation Improvements to a section of Interstate 11 (I-11/US Highway 95 (US 95)/US Highway 93

PROJECT WEBSITE: https://ndotdap.com/

All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.

Cancelled

ENVIRONMENTAL REVIEW AND PERMITTING STATUS
CANCELLED

icon_calendar

ESTIMATED COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
N/A

0 out of 0

ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED

Surface Transportation

SECTOR
Surface Transportation

Project Category

CATEGORY
Project Category DOT Projects

Department of Transportation

LEAD AGENCY
Department of Transportation, Federal Highway Administration

Description:

NDOT, in coordination with FHWA, is preparing an EIS to evaluate potential improvements to address aging bridges and provide reliable travel along a 4-mile-long segment of Interstate 11 (I 11)/U.S. Highway 95 (US 95)/U.S. Highway 93 (US 93).  The project is referred to as the Downtown Access Project (DAP). The study area is in the City of Las Vegas and Clark County, Nevada extends from the freeway between Rancho Drive and Mojave Road that has aging infrastructure and worsening congestion for current and projected (2050) travel demand, which contributes to longer travel times. A key roadway deficiency is the condition of the 1.6-mile-long Las Vegas Viaduct that carries the freeway over the Union Pacific Railroad tracks and several local streets and parking lots. 

Permitting Timetable

The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.

  • For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Loading ...
Overall Project Timetable
 
STATUS
Schedule
Extension or Delay
Ahead of Schedule
Paused
No End Date
Planned

Action Information

For additional information, please select an Action from the Permitting Timetable above.

  • Action:  
  • Responsible Agency:  
  • Bureau:  
  • Action Status:  
  • SHPO:  
  • Action Identifier:  
  • Action Outcome:  
Milestone Original Target Date Current Target Date Milestone Complete