University Lake Drive Improvements
All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.
ENVIRONMENTAL REVIEW AND PERMITTING STATUS
COMPLETE
COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED
SECTOR
Surface Transportation
CATEGORY
Project Category
DOT Projects

LEAD AGENCY
Alaska
Description:
The Alaska Department of Transportation and Public Facilities (DOT&PF). In cooperation with the Municipality of Anchorage (MOA) and Alaska Pacific University (APU), proposes a project lo upgrade and extend University Lake Drive to the northeast to connect to University Drive (a distance of approximately 0.5-mile) in Anchorage. Alaska (Figure I).
The proposed project includes:
• Construction of approximately 0.5-mile of road 011 a new alignment (undeveloped land adjacent to the existing University Lake Drive cul-de-sac).
• Construction of an at-grade access to University Lake Drive
• Pedestrian improvements
• Drainage improvements (i.e. storm drain installation. ditching)
• Utility and lighting improvements
• Clearing and grubbing vegetation