US 101-Pensinsula Avenue Interchange Project

PROJECT WEBSITE: http://www.cityofsanmateo.org/Peninsula

All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.

Paused

ENVIRONMENTAL REVIEW AND PERMITTING STATUS
PAUSED

icon_calendar

ESTIMATED COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
SUBJECT TO CHANGE

1 out of 2

ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED

Surface Transportation

SECTOR
Surface Transportation

Project Category

CATEGORY
Project Category DOT Projects

Caltrans

LEAD AGENCY
California, CalTrans

Description:

**This project is paused indefinitely due to failed Air Quality conformity** 

The California Department of Transportation (Caltrans) proposes the U.S. Highway 101/Peninsula Avenue Interchange Project in San Mateo County. Caltrans, in cooperation with the City of San Mateo and the San Mateo County Transportation Authority (SMCTA), proposes to relocate the U.S. Highway 101 southbound on- and off-ramps from East Poplar Avenue to Peninsula Avenue creating a full interchange at Peninsula Avenue and Airport Boulevard and improve bicycle and pedestrian access on the existing Peninsula Avenue overcrossing.

Permitting Timetable

The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.

  • For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Loading ...
Overall Project Timetable
 
STATUS
Schedule
Extension or Delay
Ahead of Schedule
Paused
No End Date
Planned

Action Information

For additional information, please select an Action from the Permitting Timetable above.

  • Action:  
  • Responsible Agency:  
  • Bureau:  
  • Action Status:  
  • SHPO:  
  • Action Identifier:  
  • Action Outcome:  
Milestone Original Target Date Current Target Date Milestone Complete