US 101/Produce Avenue Interchange

PROJECT WEBSITE: https://www.ssf.net/departments/public-works/engineering-division/capital-impro…

All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.

In Progress

ENVIRONMENTAL REVIEW AND PERMITTING STATUS
IN PROGRESS

icon_calendar

ESTIMATED COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
02/10/2023

2 out of 2

ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED

Surface Transportation

SECTOR
Surface Transportation

Project Category

CATEGORY
Project Category DOT Projects

Caltrans

LEAD AGENCY
California, CalTrans

Description:

The California Department of Transportation (Caltrans) in conjunction with the City of South San Francisco and the San Mateo County Transportation Authority (SMCTA) are the sponsors of the United States (US) 101/Produce Avenue Interchange Project (the project) in the City of South San Francisco, within the County of San Mateo. The project would construct a new overcrossing of United States Highway 101 (US 101) in the City of South San Francisco. The new overcrossing, referred to as the Utah Avenue extension, would connect the Utah Avenue/South Airport Boulevard intersection on the east side of US 101 to San Mateo Avenue on the west side of US 101. The intersections of Utah Avenue/South Airport Boulevard and San Mateo Avenue would also be reconstructed to include turning lanes, and to connect to the new overcrossing by a through lane on San Mateo Avenue. The Airport Boulevard/Produce Avenue/San Mateo Avenue intersection on the west side of US 101 would also be modified or reconstructed. 

 

 

Permitting Timetable

The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.

  • For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Loading ...
Overall Project Timetable
 
STATUS
Schedule
Extension or Delay
Ahead of Schedule
Paused
No End Date
Planned

Action Information

For additional information, please select an Action from the Permitting Timetable above.

  • Action:  
  • Responsible Agency:  
  • Bureau:  
  • Action Status:  
  • SHPO:  
  • Action Identifier:  
  • Action Outcome:  
Milestone Original Target Date Current Target Date Milestone Complete