US 281 Hamilton Relief Route from SH 36 to SH 22
PROJECT WEBSITE: US 281 Hamilton Truck / Relief Route Project
All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.
ENVIRONMENTAL REVIEW AND PERMITTING STATUS
IN PROGRESS
ESTIMATED COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
11/30/2027
ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED
SECTOR
Surface Transportation
CATEGORY
Project Category
DOT Projects
LEAD AGENCY
Texas
Description:
The 16.7-mile-long proposed US 281 Hamilton Truck Relief Route Project would include the installation of a 4-lane, dividided, new location roadway from 1.25 miles north of CR 203 (Leon River) to State Highway (SH) 36 and US 281 From SH 36 to CR 506 and SH 36 From US 281 to SH 36. The proposed alignment includes non-continuous two-lane frontage roads and access ramps to major cross-streets. The proposed Hamilton Truck / Relief Route would require additional right of way.
To view timetable chart, please turn device sideways (landscape)
Permitting Timetable
The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.
- For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Action Information
For additional information, please select an Action from the Permitting Timetable above.
- Action:
- Responsible Agency:
- Bureau:
- Action Status:
- SHPO:
- Action Identifier:
- Action Outcome:
| Milestone | Original Target Date | Current Target Date | Milestone Complete |
|---|