US 380 Improvements in Princeton
PROJECT WEBSITE: https://www.txdot.gov/projects/hearings-meetings/dallas/2024/us380-princeton-09…
All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.
ENVIRONMENTAL REVIEW AND PERMITTING STATUS
COMPLETE
COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED
SECTOR
Surface Transportation
CATEGORY
Project Category
DOT Projects
LEAD AGENCY
Texas
Description:
The Texas Department of Transportation proposes to improve US 380 from Farm to Market Road (FM) 1827 to County Road (CR) 560 in within the cities of McKinney, Princeton, and Farmersville in Collin County, Texas, a distance of approximately 11.8 miles.
The existing US 380 roadway would be widened and reconstructed as a freeway facility from FM 1827 to west of CR 337. From west of CR 337 to east of CR 458, the freeway would be on new location north of the city of Princeton, at which point it would rejoin the existing US 380 alignment and would be reconstructed as a freeway to CR 560 east of Lavon Lake.
The existing ROW width is approximately 120-160 feet. The existing ROW width at the existing Lavon Lake bridge is approximately 200 feet. The proposed ROW would be approximately 320-536 feet wide.