US Hwy 95 Widen Shoulders and Install Rumble Strips
PROJECT WEBSITE: https://dot.ca.gov/caltrans-near-me/district-8/district-8-current-projects/us-h…
All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.
ENVIRONMENTAL REVIEW AND PERMITTING STATUS
COMPLETE
COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
02/22/2018
ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED
SECTOR
Surface Transportation
CATEGORY
Project Category
DOT Projects

LEAD AGENCY
California, CalTrans
Description:
The California Department of Transportation (Caltrans) plans to construct two 8-foot standard shoulders, by widening the existing shoulders, and install 12-inch wide ground-in rumble strips along the centerline and along the shoulders in each direction, along a horizontal curve on existing United States Highway 95 (US-95) from post mile (PM) 65.4 to PM 66.0, located in a portion of unincorporated San Bernardino County, California. Additionally, the existing 24-foot-wide mainline would be cold planed 0.2 feet, and would be overlaid for 0.2 feet with Rubberized Hot-Mix Asphalt (RHMA).
The purpose of this project is to address safety concerns caused by motorists who drift from lanes.
To view timetable chart, please turn device sideways (landscape)
Permitting Timetable
The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.
- For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Action Information
For additional information, please select an Action from the Permitting Timetable above.
- Action:
- Responsible Agency:
- Bureau:
- Action Status:
- SHPO:
- Action Identifier:
- Action Outcome:
Milestone | Original Target Date | Current Target Date | Milestone Complete |
---|