Washington Dulles International Airport (IAD) Western Solar Development
All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.
ENVIRONMENTAL REVIEW AND PERMITTING STATUS
COMPLETE
COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
01/05/2023
ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED
SECTOR
Aviation
CATEGORY
Project Category
DOT Projects
LEAD AGENCY
Department of Transportation, Federal Aviation Administration
Description:
The Metropolitan Washington Airports Authority (Airports Authority) is proposing to sublease approximately 800 acres of land in the southwest portion of Washington Dulles International Airport (IAD or the Airport) to Dominion Energy for development of a utility-scale solar photovoltaic (PV) system facility. The proposed solar PV facility would consist of arrays of approximately 350,000 to 400,000 solar PV modules and the associated supports, infrastructure, equipment, and access roads to provide approximately 100 megawatts of electricity to the public electrical grid to be used by Dominion Energy customers including the Airports Authority; along with a small-scale parking lot solar PV system to provide renewable energy directly to the Airport.
To view timetable chart, please turn device sideways (landscape)
Permitting Timetable
The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.
- For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Action Information
For additional information, please select an Action from the Permitting Timetable above.
- Action:
- Responsible Agency:
- Bureau:
- Action Status:
- SHPO:
- Action Identifier:
- Action Outcome:
| Milestone | Original Target Date | Current Target Date | Milestone Complete |
|---|