Washington Dulles International Airport (IAD) Z-Gates

All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.

Cancelled

ENVIRONMENTAL REVIEW AND PERMITTING STATUS
CANCELLED

icon_calendar

ESTIMATED COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
N/A

2 out of 2

ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED

Aviation

SECTOR
Aviation

Project Category

CATEGORY
Project Category DOT Projects

Department of Transportation

LEAD AGENCY
Department of Transportation, Federal Aviation Administration

Description:

Expand the existing set of four Z-Gates to the east with the construction of an additional three aircraft gates along with a central circulation corridor, hold rooms, concessions, passenger amenities, and other support functions for domestic operations. The project also includes restriping to realign the existing Mobile Lounge road and vehicle service road along the north and east side of the new facility; connecting the existing inactive hydrant fuel line and fuel pits at the Z-Gates facility to an existing main north-south hydrant fuel line along Taxiway J; improving the interior amenities of the existing four Z-Gates to enhance passenger experience; and potentially renovating the existing apron south of the proposed new facility.

Permitting Timetable

The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.

  • For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Loading ...
Overall Project Timetable
 
STATUS
Schedule
Extension or Delay
Ahead of Schedule
Paused
No End Date
Planned

Action Information

For additional information, please select an Action from the Permitting Timetable above.

  • Action:  
  • Responsible Agency:  
  • Bureau:  
  • Action Status:  
  • SHPO:  
  • Action Identifier:  
  • Action Outcome:  
Milestone Original Target Date Current Target Date Milestone Complete