Westwind Drive (Route 2988)
All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.
ENVIRONMENTAL REVIEW AND PERMITTING STATUS
IN PROGRESS
ESTIMATED COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
11/15/2024
ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED
SECTOR
Surface Transportation
CATEGORY
Project Category
DOT Projects
LEAD AGENCY
Department of Transportation, Federal Highway Administration
Description:
The proposed project involves constructing a new road to complete a missing link and improve connectivity between Loudoun County Parkway (Route 607) and Old Ox Road (Route 606) in Loudoun County. The project includes the reconstruction and widening of the existing section of Westwind Drive from Loudoun County Parkway to State Street; construction of a new segment of Westwind Drive from State Street to Ladbrook Drive; and reconstruction and widening of the existing section of Ladbrook Drive from the southern terminus of the new alignment to Old Ox Road. A bridge is to be constructed over Broad Run. Westwind Drive would be designed as a four-lane divided minor arterial with a design speed of 40 mph. Design variations within the location corridor will be considered to minimize impacts.
To view timetable chart, please turn device sideways (landscape)
Permitting Timetable
The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.
- For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Action Information
For additional information, please select an Action from the Permitting Timetable above.
- Action:
- Responsible Agency:
- Bureau:
- Action Status:
- SHPO:
- Action Identifier:
- Action Outcome:
| Milestone | Original Target Date | Current Target Date | Milestone Complete |
|---|