USA Banner

Official US Government Icon

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

Secure Site Icon

Secure .gov websites use HTTPS
A lock ( ) or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

Yuba 70 (Segment 4 & 5)

All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.

Complete

ENVIRONMENTAL REVIEW AND PERMITTING STATUS
COMPLETE

icon_calendar

COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
02/18/2021

2 out of 2

ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED

Surface Transportation

SECTOR
Surface Transportation

Project Category

CATEGORY
Project Category DOT Projects

Caltrans

LEAD AGENCY
California, CalTrans

Other Agencies with Actions or Authorizations:

California

California

Department of the Army

Department of the Army, US Army Corps of Engineers - Regulatory

Description:

The California Department of Transportation (Caltrans) proposes to  improve safety, goods movement and emergency evacuation along the State Route 70 corridor. This segment of State Route (SR) 70 is in Yuba County, north of Marysville, between Post Miles (PM) 16.2 from Laurellen/SR 70 intersection and 25.8 (0.1 miles south of the Butte County line). The project proposes to provide a five-lane cross-section within the full postmile limits; PM 16.2 – 25.8. Two 12-foot travel lanes and 8-foot shoulder would be provided in each direction with a 14-foot wide continuous center Two Way Left Turn Lane (TWLTL) bounded by a minimum 20-foot Clear Recovery Zone (CRZ). The CRZ will incorporate side slopes of 4:1 or flatter and necessitate removal of any physical obstructions such as trees, utility poles, and other fixed objects.

Permitting Timetable

The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.

  • For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Loading ...
Overall Project Timetable
 
STATUS
Schedule
Extension or Delay
Ahead of Schedule
Paused
No End Date
Planned

Action Information

For additional information, please select an Action from the Permitting Timetable above.

  • Action:  
  • Responsible Agency:  
  • Bureau:  
  • Action Status:  
  • SHPO:  
  • Action Identifier:  
  • Action Outcome:  
Milestone Original Target Date Current Target Date Milestone Complete