East Side Coastal Resiliency
PERMITTING DASHBOARD PROJECT POSTING DATE: SEPTEMBER 22, 2016PROJECT WEBSITE: NYC Community Development Block Grant Disaster Recovery
All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.
ENVIRONMENTAL REVIEW AND PERMITTING STATUS
COMPLETE
COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
03/12/2020
ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED
SECTOR
Water Resources
CATEGORY
Project Category
FAST-41 Covered Projects
LEAD AGENCY
Housing and Urban Development, Community Planning and Development/Community Development Fund
Description:
The East Side Coastal Resiliency project (ESCR) is a comprehensive urban water management project designed to reduce the risk of floods from coastal storm surges and/or flooding from high-intensity rainfall events. The Proposed Rebuild by Design Project would be located in the Borough of Manhattan, NY (the Project Area). The purpose of the Proposed Project is to address coastal flooding vulnerability in a manner that reduces the flooding risk while enhancing waterfront open spaces and access to the waterfront. The principal objectives of the Proposed Project are as follows: (1) provide a reliable coastal flood protection system against the design storm event for the protected area; (2) improve access to, and enhance open space resources along the waterfront, including East River Park and Stuyvesant Cove Park; (3) respond quickly to the urgent need for flood protection and resiliency, particularly for communities that have a large concentration of residents in affordable and public housing units along the proposed project area; and (4) achieve implementation milestones and comply with the conditions attached to funding allocations as established by HUD, including scheduling milestones. The Proposed Project was paused in August 2018 while the Community Development Block Grant-Disaster Recovery grantee New York City Office of Management, in cooperation with the Project lead New York City Department of Design and Construction and project partner New York City Department of Parks and Recreation re-evaluated the project design. That re-evaluation resulted in a newly identified preferred alternative that is analyzed in the DEIS made available for public comment on April 5, 2019.
To view timetable chart, please turn device sideways (landscape)
Permitting Timetable
The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.
- For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Action Information
For additional information, please select an Action from the Permitting Timetable above.
- Action:
- Responsible Agency:
- Bureau:
- Action Status:
- SHPO:
- Action Identifier:
- Action Outcome:
| Milestone | Original Target Date | Current Target Date | Milestone Complete |
|---|