G3 Expansion Project

PERMITTING DASHBOARD PROJECT POSTING DATE: AUGUST 11, 2026

PROJECT WEBSITE: https://dtmidstream.com/ferc-project/g3/#documents

All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.

Planned

ENVIRONMENTAL REVIEW AND PERMITTING STATUS
PLANNED

icon_calendar

ESTIMATED COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
PENDING

0 out of 0

ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED

Pipelines

SECTOR
Pipelines

Project Category

CATEGORY
Project Category FAST-41 Covered Projects

Federal Energy Regulatory Commission

LEAD AGENCY
Federal Energy Regulatory Commission

View FAST-41 Postings by Agencies

Description:

The project sponsor proposes to construct natural gas pipeline facilities composed of new, looped pipeline facilities and compression additions. Two separate pipeline loops are proposed in Illinois, totaling approximately 68 miles: the Joliet Loop and the Sycamore Loop. The Joliet Loop consists of approximately 42 miles of 36-inch-diameter pipeline loop in Kendall and DeKalb Counties. The Sycamore Loop consists of approximately 26 miles of 36-inch-diameter pipeline loop in DeKalb and McHenry Counties. The pipeline loops would be installed in parallel to the existing Guardian pipeline right-of-way. 

 

The project also involves the installation of two new natural gas compressor units at the existing Joliet Compressor Station, modifications to the existing Sycamore Compressor Station, construction of a new electric compressor station in Dodge County, Wisconsin, removal of existing controls currently restricting throughput capacity capability at Guardian’s existing Bluff Creek Compressor Station, as well as the construction of a new delivery meter station and other appurtenant pipeline facilities.