Piney Woods Development

PERMITTING DASHBOARD PROJECT POSTING DATE: JUNE 19, 2026

All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.

Planned

ENVIRONMENTAL REVIEW AND PERMITTING STATUS
PLANNED

icon_calendar

ESTIMATED COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
PENDING

0 out of 0

ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED

Conventional Energy Production

SECTOR
Conventional Energy Production

Project Category

CATEGORY
Project Category FAST-41 Covered Projects

Department of Agriculture

LEAD AGENCY
Department of Agriculture, US Forest Service

View FAST-41 Postings by Agencies

Description:

The overall project includes the proposal of up to nine oil and gas well pads, access roads, associated electrical lines and gathering pipelines connecting well pads. Temporary access roads may be utilized during construction. The proposed well pads will require a useable surface area of 820’ x 610’ with total disturbance depending on site specific construction requirements. Each well pad will have up to six proposed wells (total of 54 wells) that will be horizontally drilled into both private and BLM managed minerals with the intent of producing primarily natural gas. The project area is located in San  Augustine County, TX, directly west of the town of Broaddus, TX and within the Angelina National Forest, National Forests and Grassland in Texas.