Angel Island
All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.
ENVIRONMENTAL REVIEW AND PERMITTING STATUS
IN PROGRESS
ESTIMATED COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
02/07/2028
ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED
SECTOR
Mining
CATEGORY
Project Category
FAST-41 Transparency Projects
LEAD AGENCY
Department of the Interior, Bureau of Land Management
Description:
Angel Island is a development stage lithium project located in Clayton Valley in Esmeralda County, NV. Angel Island is located on BLM-administered public lands in south central Nevada. The project is initiated by Cypress Holdings (Nevada), Ltd., a wholly owned subsidiary of Century Lithium Corp.
Lithium is contained within a mudstone unit and three zones of a claystone unit. The deposit is essentially flat-lying with minimal to no overburden. Mining will be accomplished by ripping the ore, loading into trucks or onto an in-pit conveyor and transporting to the processing facility via either trucks or an in-pit conveyor system. No drilling and blasting is anticipated. Other facilities, in addition to the open pit, would include two overburden stockpiles, two low-grade ore stockpiles, a dry-stack tailings storage facility, roads, a warehouse and office, a shop, a laboratory, and a processing/leaching facility.
At the projected annual mill feed of 6 million tons, the daily operating rate is approximately 16,500 tons/day. Due to the flat-lying nature of the deposit and the minimal overburden, the stripping ratio is <0.3:1 (overburden to feed/ore). At these production rates, estimated lithium carbonate extraction is 29,250 tons per year.
This project is posted in the interest of transparency and response to Executive Order 14241.
To view timetable chart, please turn device sideways (landscape)
Permitting Timetable
The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.
- For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Action Information
For additional information, please select an Action from the Permitting Timetable above.
- Action:
- Responsible Agency:
- Bureau:
- Action Status:
- SHPO:
- Action Identifier:
- Action Outcome:
| Milestone | Original Target Date | Current Target Date | Milestone Complete |
|---|