I-10 Wildwood Canyon Road Interchange Project

PROJECT WEBSITE: https://yucaipa.org/wildwoodcanyonrdinterchange/

All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.

In Progress

ENVIRONMENTAL REVIEW AND PERMITTING STATUS
IN PROGRESS

icon_calendar

ESTIMATED COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
10/01/2026

1 out of 2

ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED

Surface Transportation

SECTOR
Surface Transportation

Project Category

CATEGORY
Project Category DOT Projects

Caltrans

LEAD AGENCY
California, CalTrans

Description:

The California Department of Transportation (Caltrans) in cooperation with the the City of Yucaipa and San Bernardino County Transportation Authority (SBCTA), is proposing to establish a new interchange connection on Interstate 10 (I‐10) at Wildwood Canyon Road, between the Live Oak Canyon Road/Oak Glen Road Interchange and the County Line Road Interchange, in City of Yucaipa, County of San Bernardino, California. 


The I‐10 Wildwood Canyon Road Interchange Project (Project) would provide improved access to and from I‐10 and accommodate future development. Associated improvements for the Project include new connecting roadways and/or realignment of existing local roadways, overcrossing bridge structures, signage, and the protection or relocation of utilities. The Wildwood Safety Roadside Rest Area would remain in place.

Permitting Timetable

The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.

  • For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Loading ...
Overall Project Timetable
 
STATUS
Schedule
Extension or Delay
Ahead of Schedule
Paused
No End Date
Planned

Action Information

For additional information, please select an Action from the Permitting Timetable above.

  • Action:  
  • Responsible Agency:  
  • Bureau:  
  • Action Status:  
  • SHPO:  
  • Action Identifier:  
  • Action Outcome:  
Milestone Original Target Date Current Target Date Milestone Complete