Coos Bay, Oregon Section 408/204(f) Channel Modification
PROJECT WEBSITE: Coos Bay Proposed Channel Modification
All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.
ENVIRONMENTAL REVIEW AND PERMITTING STATUS
CANCELLED
ESTIMATED COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
N/A
ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED
SECTOR
Ports and Waterways
CATEGORY
Project Category
Other Projects
LEAD AGENCY
Department of the Army, US Army Corps of Engineers - Civil Works
Description:
The Oregon International Port of Coos Bay (OIPCB) proposes to widen and deepen the Coos Bay Federal Navigation Project from the ocean to river mile (RM) 8.2 to improve navigation efficiency, reduce shipping transportation costs, and facilitate the shipping industry’s transition to larger, more efficient vessels. The OIPCB is using an authority provided by the U.S. Congress under Section 204 of the Water Resources Development Act of 1986, as amended.
The Port is coordinating with the U.S. Army Corps of Engineers (USACE), Portland District on the design and engineering of the proposed alteration and long-term maintenance of the channel. The OIPCB is evaluating channel modifications and maintenance dredging of the channel and inlet; possible modifications to the jetties would also be evaluated. This is a single-purpose study for deep draft navigation. Physical construction cannot commence until the 33 USC 408 permission and Section 404 (CWA) permit are received from the Corps of Engineers.
To view timetable chart, please turn device sideways (landscape)
Permitting Timetable
The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.
- For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Action Information
For additional information, please select an Action from the Permitting Timetable above.
- Action:
- Responsible Agency:
- Bureau:
- Action Status:
- SHPO:
- Action Identifier:
- Action Outcome:
Milestone | Original Target Date | Current Target Date | Milestone Complete |
---|