USA Banner

Official US Government Icon

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

Secure Site Icon

Secure .gov websites use HTTPS
A lock ( ) or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

Double Track - NWI

PROJECT WEBSITE: Double Track NWI

All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.

Complete

ENVIRONMENTAL REVIEW AND PERMITTING STATUS
COMPLETE

icon_calendar

COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
02/17/2021

4 out of 4

ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED

Surface Transportation

SECTOR
Surface Transportation

Project Category

CATEGORY
Project Category DOT Projects

Department of Transportation

LEAD AGENCY
Department of Transportation, Federal Transit Administration

Other Agencies with Actions or Authorizations:

Department of the Interior

Department of the Interior, Fish and Wildlife Service

Department of the Army

Department of the Army, US Army Corps of Engineers - Regulatory

Description:

The South Shore Line (SSL) is a 90-mile electrically powered commuter rail line that operates from South Bend International Airport in South Bend, Indiana, to Millennium Station in downtown Chicago, Illinois. Currently, the SSL commuter line operates for 17 miles on a double-track right-of-way from 115th Street in Chicago to Gary, Indiana. From Gary to South Bend (approximately 59 miles), the railroad is mostly single track, except for one 6.5-mile section of double track and three separate passing sidings that total 2.2 miles. Most of the SSL commuter line shares trackage with the Chicago South Shore and South Bend Railroad (CSS) freight service. The SSL commuter line borders and provides train service through the Indiana Dunes State Park and the Indiana Dunes National Lakeshore. For approximately 2 miles in Michigan City, Indiana, the railroad track is embedded within 10th Street and 11th Street, and trains operate within roadway ROW alongside automobiles. The current track configuration within the roadways in Michigan City, coupled with a stretch of 36 at-grade crossing conflicts within 3 miles, present safety issues for commuters, motorists, pedestrians, and cyclists.

Present SSL weekday commuter service includes 19 inbound trains and 20 outbound trains that serve Chicago. The SSL links northwest Indiana to centers of commerce such as the Chicago Central Business District. Currently, nearly 70 percent of daily SSL commuter trips are work-related. SSL commuters frequently experience delays and long travel times because of the limited capacity of the single track for the majority of the corridor. Existing capacity is already constrained, with future increases in ridership expected to compound problems.

 

Permitting Timetable

The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.

  • For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Loading ...
Overall Project Timetable
 
STATUS
Schedule
Extension or Delay
Ahead of Schedule
Paused
No End Date
Planned

Action Information

For additional information, please select an Action from the Permitting Timetable above.

  • Action:  
  • Responsible Agency:  
  • Bureau:  
  • Action Status:  
  • SHPO:  
  • Action Identifier:  
  • Action Outcome:  
Milestone Original Target Date Current Target Date Milestone Complete