All Projects
It is important to note that a project’s inclusion on the Permitting Dashboard does not imply Federal endorsement of or support for the project or create a presumption that a covered project will be approved, favorably reviewed by any agency, or receive Federal funding. The inclusion of a project on the Permitting Dashboard may be reconsidered based on updated information related to, for example, a change in the scope of the Federal environmental review and authorization processes that apply to the project proposal.
*If you are interested in learning more about how to have a project covered under FAST-41, the Permitting Council Office of the Executive Director is available to engage in pre-application consultations. Email FAST.FortyOne@permitting.gov for more information.
- FAST-41 Covered Projects: Projects Identified as Covered Projects under Title 41 of the Fixing America’s Surface Transportation (FAST) Act
- Transparency Projects: Projects directed by the Executive Director of the Federal Permitting Improvement Steering Council to be posted on the Dashboard in the interests of transparency.
- DOT Projects: Department of Transportation (DOT) projects subject to Titles I, IX, and XI of the FAST Act
- Other Projects: Other projects tracked on the Permitting Dashboard
The full project data set and a pre-filtered report created from the full project data set is now available in the Permitting Dashboard Data Portal to download project and timeline information
Title | Agency | Sector | Status | Category |
---|---|---|---|---|
Merritt Island Airport South Hangar Development | Department of Transportation, Federal Aviation Administration | Aviation, Airport Development Projects (Aviation programs, commerce and safety, airport development and noise, financing, public airports) | In Progress | DOT Projects |
METRO Blue Line Extension (Bottineau Light Rail Transit) | Department of Transportation, Federal Transit Administration | Surface Transportation, Public Transportation | In Progress | DOT Projects |
METRO Purple Line Bus Rapid Transit Project | Department of Transportation, Federal Transit Administration | Surface Transportation, Public Transportation | Paused | DOT Projects |
Miami-Dade County Back-Bay Coastal Storm Risk Management Project | Department of the Army, US Army Corps of Engineers - Civil Works | Water Resources, Other Water Resource Projects (incl. Waste/Storm-water Infrastructure; Flood Risk Management; Navigation; Restoration activities associated with non-Bureau of Reclamation infrastructure) | Class of Action Changed | Other Projects |
Mid-Barataria Sediment Diversion | Department of the Army, US Army Corps of Engineers - Regulatory | Water Resources, Other Water Resource Projects (incl. Waste/Storm-water Infrastructure; Flood Risk Management; Navigation; Restoration activities associated with non-Bureau of Reclamation infrastructure) | Complete | FAST-41 Covered Projects |
Mid-Breton Sediment Diversion | Department of the Army, US Army Corps of Engineers - Regulatory | Water Resources, Other Water Resource Projects (incl. Waste/Storm-water Infrastructure; Flood Risk Management; Navigation; Restoration activities associated with non-Bureau of Reclamation infrastructure) | In Progress | FAST-41 Covered Projects |
Mid-Currituck | Department of Transportation, Federal Highway Administration | Surface Transportation, Bridges | Complete | DOT Projects |
Middle Gibraltar Road over Waterway Canal | Department of Transportation, Federal Highway Administration | Surface Transportation, Bridges | Complete | DOT Projects |
Middlesboro-Bell County Airport Obstruction Removal Environmental Assessment | Department of Transportation, Federal Aviation Administration | Aviation, Airport Development Projects (Aviation programs, commerce and safety, airport development and noise, financing, public airports) | Complete | DOT Projects |
Midvalley Connector BRT EA | Department of Transportation, Federal Transit Administration | Surface Transportation, Public Transportation | Complete | DOT Projects |
Midvalley Highway EA | Utah | Surface Transportation, Highways | Complete | DOT Projects |
Milwaukee County Airport (MKE) - Decommissioning of Runway 13/31 and Runway 1R/19L | Department of Transportation, Federal Aviation Administration | Aviation, Airport Development Projects (Aviation programs, commerce and safety, airport development and noise, financing, public airports) | In Progress | DOT Projects |
Milwaukee County Airport (MKE) - Decommissioning of Runway Runway 13/31 | Department of Transportation, Federal Aviation Administration | Aviation, Airport Development Projects (Aviation programs, commerce and safety, airport development and noise, financing, public airports) | Cancelled | DOT Projects |
Milwaukee County Airport (MKE) - Decommissioning of Runway Runway 1R/19L | Department of Transportation, Federal Aviation Administration | Aviation, Airport Development Projects (Aviation programs, commerce and safety, airport development and noise, financing, public airports) | Cancelled | DOT Projects |
Milwaukee East-West BRT Environmental Assessment | Department of Transportation, Federal Transit Administration | Surface Transportation, Public Transportation | Complete | DOT Projects |
Mineville Energy Storage Project | Federal Energy Regulatory Commission | Renewable Energy Production, Non-Federal Hydropower - Licenses (including Non-Federal Marine and Hydrokinetic Projects) | Cancelled | Other Projects |
Minneapolis-St. Paul to Milwaukee High-Speed Rail Corridor | Department of Transportation, Federal Railroad Administration | Surface Transportation, Railroads | Cancelled | DOT Projects |
Minot International Airport Wildlife Hazard and Draining Improvements Environmental Assessment | Department of Transportation, Federal Aviation Administration | Aviation, Airport Development Projects (Aviation programs, commerce and safety, airport development and noise, financing, public airports) | Complete | DOT Projects |
Missouri Valley Bypass | Department of Transportation, Federal Highway Administration | Surface Transportation, Highways | In Progress | DOT Projects |
MMIP - I-285/I20 INTERCHANGE RECONSTRUCTION - EAST SIDE | Department of Transportation, Federal Highway Administration | Surface Transportation, Highways | Complete | DOT Projects |