DOT Projects
It is important to note that a project’s inclusion on the Permitting Dashboard does not imply Federal endorsement of or support for the project or create a presumption that a covered project will be approved, favorably reviewed by any agency, or receive Federal funding. The inclusion of a project on the Permitting Dashboard may be reconsidered based on updated information related to, for example, a change in the scope of the Federal environmental review and authorization processes that apply to the project proposal.
- FAST-41 Covered Projects: Projects Identified as Covered Projects under Title 41 of the Fixing America’s Surface Transportation (FAST) Act
- DOT Projects: Department of Transportation (DOT) projects subject to Titles I, IX, and XI of the FAST Act
- Other Projects: Other projects tracked on the Permitting Dashboard
The full project data set and a pre-filtered report created from the full project data set is now available in the Permitting Dashboard Data Portal to download project and timeline information
The infrastructure projects below are DOT projects subject to Titles I, IX, and XI of the Fixing America’s Surface Transportation (FAST) Act.
Title | Agency | Sector | Status |
---|---|---|---|
Falcon Field Airport Mesa Hangars/Davcon Development, Environmental Assessment | Department of Transportation, Federal Aviation Administration | Aviation, Airport Development Projects (Aviation programs, commerce and safety, airport development and noise, financing, public airports) | Complete |
I-10 Wildwood Canyon Road Interchange Project | California, CalTrans | Surface Transportation, Bridges | In Progress |
(TX) Austin Avenue Bridges (Morrow Street to Third Street) | Texas | Surface Transportation, Highways | Class of Action Changed |
(TX) Extend FM 1301 on New Location (from SH 60 to US 59) | Texas | Surface Transportation, Highways | Complete |
(TX) FM 2001 (from IH 35 to SH 21) | Texas | Surface Transportation, Highways | Complete |
(TX) FM 518 (from FM 865 to SH 35) | Texas | Surface Transportation, Highways | Complete |
(TX) FM 518 (from SH 288 to FM 865) | Texas | Surface Transportation, Highways | Complete |
(TX) FM 664 (US 287 to FM 1387) | Texas | Surface Transportation, Highways | Complete |
(TX) FM 676 and Mile 5 (From SH 107 to Taylor Road) | Texas | Surface Transportation, Highways | In Progress |
(TX) FM 756 Paluxy Dr | Texas | Surface Transportation, Highways | In Progress |
(TX) IH 10/69 Interchanges (Hollywood Overpass to 7th Street) | Texas | Surface Transportation, Highways | Complete |
(TX) IH 820 Southeast Connector | Texas | Surface Transportation, Highways | Complete |
(TX) IH-35 at Red River | Texas | Surface Transportation, Highways | Complete |
(TX) IH-35 Capital Express North | Texas | Surface Transportation, Highways | Complete |
(TX) IH-35 Capital Express South | Texas | Surface Transportation, Highways | In Progress |
(TX) IH-35W Frontage Roads (Dale Earnhardt to S.of IH-35 E/W Interchange) | Texas | Surface Transportation | Complete |
(TX) Kenny Fort Blvd (Segment 2, 3) (from SH 45 North to Forest Creek Dr) | Texas | Surface Transportation, Highways | Complete |
(TX) Loop 1604 from SH 16 to IH 35 Expansion | Texas | Surface Transportation, Highways | Complete |
(TX) Robert S. Light Blvd (from 976 to FM 1626) | Texas | Surface Transportation, Highways | Complete |
(TX) SH 286 (FM 43 to FM 2444) | Texas | Surface Transportation, Highways | In Progress |