All Projects
It is important to note that a project’s inclusion on the Permitting Dashboard does not imply Federal endorsement of or support for the project or create a presumption that a covered project will be approved, favorably reviewed by any agency, or receive Federal funding. The inclusion of a project on the Permitting Dashboard may be reconsidered based on updated information related to, for example, a change in the scope of the Federal environmental review and authorization processes that apply to the project proposal.
*If you are interested in learning more about how to have a project covered under FAST-41, the Permitting Council Office of the Executive Director is available to engage in pre-application consultations. Email FAST.FortyOne@permitting.gov for more information.
- FAST-41 Covered Projects: Projects Identified as Covered Projects under Title 41 of the Fixing America’s Surface Transportation (FAST) Act
- Transparency Projects: Projects directed by the Executive Director of the Federal Permitting Improvement Steering Council to be posted on the Dashboard in the interests of transparency.
- DOT Projects: Department of Transportation (DOT) projects subject to Titles I, IX, and XI of the FAST Act
- Other Projects: Other projects tracked on the Permitting Dashboard
The full project data set and a pre-filtered report created from the full project data set is now available in the Permitting Dashboard Data Portal to download project and timeline information
Title | Agency | Sector | Status | Category |
---|---|---|---|---|
Mulino Airport Obstruction Removal, Grading Improvements and Fence Construction Project Environmental Assessment | Department of Transportation, Federal Aviation Administration | Aviation, Airport Development Projects (Aviation programs, commerce and safety, airport development and noise, financing, public airports) | Complete | DOT Projects |
MVP Southgate CP19-14 | Federal Energy Regulatory Commission | Pipelines, Interstate Natural Gas Pipelines | Paused | Other Projects |
Myrtle Beach International Airport, Runway 18-26 Reconstruction | Department of Transportation, Federal Aviation Administration | Aviation, Airport Development Projects (Aviation programs, commerce and safety, airport development and noise, financing, public airports) | Complete | DOT Projects |
Nail Road Extension | Department of Transportation, Federal Highway Administration | Surface Transportation, Highways | In Progress | DOT Projects |
Napa Br. Sub-Structures/Scour: Bridge Preventive Maintenance | California, CalTrans | Surface Transportation, Highways | Cancelled | DOT Projects |
Nashua-Manchester Commuter Rail (Capitol Corridor) Project EA | Department of Transportation, Federal Transit Administration | Surface Transportation | Paused | DOT Projects |
Nashville International Airport Terminal A Expansion | Department of Transportation, Federal Aviation Administration | Aviation, Airport Development Projects (Aviation programs, commerce and safety, airport development and noise, financing, public airports) | Complete | DOT Projects |
Nassau County Back Bays Coastal Storm Risk Management Feasibility Study | Department of the Army, US Army Corps of Engineers - Civil Works | Water Resources, Other Water Resource Projects (incl. Waste/Storm-water Infrastructure; Flood Risk Management; Navigation; Restoration activities associated with non-Bureau of Reclamation infrastructure) | In Progress | Other Projects |
National Trails Highway: Bridge Replacements | California | Surface Transportation, Bridges | Paused | DOT Projects |
Naval Station Norfolk Transit Corridor Phase 1 | Department of Transportation, Federal Transit Administration | Surface Transportation, Public Transportation | Paused | DOT Projects |
ND 1804 Red Mike Area to CR42 | Department of Transportation, Federal Highway Administration | Surface Transportation, Highways | Complete | DOT Projects |
NEC Future | Department of Transportation, Federal Railroad Administration | Surface Transportation, Railroads | Complete | DOT Projects |
New England Wind | Department of the Interior, Bureau of Ocean Energy Management | Renewable Energy Production, Wind: Federal Offshore | Complete | FAST-41 Covered Projects |
NEW INTERCHANGE - I-85 AT MCGINNIS FERRY RD | Department of Transportation, Federal Highway Administration | Surface Transportation, Roads | In Progress | DOT Projects |
New Jersey Back Bays Coastal Storm Risk Management Feasibility Study | Department of the Army, US Army Corps of Engineers - Civil Works | Water Resources, Other Water Resource Projects (incl. Waste/Storm-water Infrastructure; Flood Risk Management; Navigation; Restoration activities associated with non-Bureau of Reclamation infrastructure) | In Progress | Other Projects |
New Mexico Unit | Department of the Interior, Bureau of Reclamation | Water Resources, Irrigation and related water supply projects | Cancelled | Other Projects |
New Ulm Municipal Airport, Turf Crosswind Runway Relocation Project | Department of Transportation, Federal Aviation Administration | Aviation, Airport Development Projects (Aviation programs, commerce and safety, airport development and noise, financing, public airports) | In Progress | DOT Projects |
New York and New Jersey Harbor and Tributaries Study (HATS) | Department of the Army, US Army Corps of Engineers - Civil Works | Water Resources, Other Water Resource Projects (incl. Waste/Storm-water Infrastructure; Flood Risk Management; Navigation; Restoration activities associated with non-Bureau of Reclamation infrastructure) | Cancelled | Other Projects |
Newell Road over San Francisquito Creek (Bridge 37C0223) | California, CalTrans | Surface Transportation, Bridges | Complete | DOT Projects |
Nexus Gas Transmission, TEAL, DTE Lease, and Vector Lease | Federal Energy Regulatory Commission | Pipelines, Interstate Natural Gas Pipelines | Complete | FAST-41 Covered Projects |