All Projects
It is important to note that a project’s inclusion on the Permitting Dashboard does not imply Federal endorsement of or support for the project or create a presumption that a covered project will be approved, favorably reviewed by any agency, or receive Federal funding. The inclusion of a project on the Permitting Dashboard may be reconsidered based on updated information related to, for example, a change in the scope of the Federal environmental review and authorization processes that apply to the project proposal.
*If you are interested in learning more about how to have a project covered under FAST-41, the Permitting Council Office of the Executive Director encourages you to engage with their office in pre-application consultations. Email FAST-41@permitting.gov for more information. To learn more about Fast-41 covered projects, please visit the Permitting Council’s new website at permitting.gov.
Classifications of projects that are contained within the Federal Infrastructure Permitting Dashboard:
- FAST-41 Covered Projects: Projects Identified as Covered Projects under Title 41 of the Fixing America’s Surface Transportation (FAST) Act
- FAST-41 Transparency Projects: Projects directed by the Executive Director of the Federal Permitting Improvement Steering Council to be posted on the Dashboard in the interests of transparency.
- DOT Projects: Department of Transportation (DOT) projects subject to Titles I, IX, and XI of the FAST Act
- Other Projects: Other projects tracked on the Permitting Dashboard
The full project data set and a pre-filtered report created from the full project data set is now available in the Permitting Dashboard Data Portal to download project and timeline information.
| Title Sort descending | Agency | Sector | Status | Category |
|---|---|---|---|---|
| IMPROVEMENTS TO STATE ROUTE 37 | California, CalTrans | Surface Transportation, Highways | Cancelled | DOT Projects |
| (TX) Austin Avenue Bridges (Morrow Street to Third Street) | Texas | Surface Transportation, Highways | Class of Action Changed | DOT Projects |
| (TX) Borderland Expressway | Texas | Surface Transportation, Highways | Complete | DOT Projects |
| (TX) Denton County Outer Loop | Texas | Surface Transportation, Highways | In Progress | DOT Projects |
| (TX) Downtown 10 (El Paso Executive Center Blvd to SL 478) | Texas | Surface Transportation, Highways | In Progress | DOT Projects |
| (TX) East Loop (Old SH 32) | Texas | Surface Transportation, Highways | In Progress | DOT Projects |
| (TX) East West Connector (Rental Car Drive) | Texas | Surface Transportation, Highways | Complete | DOT Projects |
| (TX) Extend FM 1301 on New Location (from SH 60 to US 59) | Texas | Surface Transportation, Highways | Complete | DOT Projects |
| (TX) FM 2001 (from IH 35 to SH 21) | Texas | Surface Transportation, Highways | Complete | DOT Projects |
| (TX) FM 2220 Ware Road Widening SH 107 to Mile 5 | Texas | Surface Transportation, Highways | Complete | DOT Projects |
| (TX) FM 3349 at US 79 (FM 3349 & CR 110) | Texas | Surface Transportation, Highways | Complete | DOT Projects |
| (TX) FM 518 (from FM 865 to SH 35) | Texas | Surface Transportation, Highways | Complete | DOT Projects |
| (TX) FM 518 (from SH 288 to FM 865) | Texas | Surface Transportation, Highways | Complete | DOT Projects |
| (TX) FM 664 (US 287 to FM 1387) | Texas | Surface Transportation, Highways | Complete | DOT Projects |
| (TX) FM 676 and Mile 5 (From SH 107 to Taylor Road) | Texas | Surface Transportation, Highways | Complete | DOT Projects |
| (TX) FM 70/SH 286 Passing Lanes | Texas | Surface Transportation, Highways | Complete | DOT Projects |
| (TX) FM 756 Paluxy Dr | Texas | Surface Transportation, Highways | Complete | DOT Projects |
| (TX) Hachar-Reuthinger Rd | Texas | Surface Transportation, Highways | Complete | DOT Projects |
| (TX) IH 10 (from FM 2434 to US 90) | Texas | Surface Transportation, Highways | Complete | DOT Projects |
| (TX) IH 10/69 Interchanges (Hollywood Overpass to 7th Street) | Texas | Surface Transportation, Highways | Complete | DOT Projects |