All Projects
It is important to note that a project’s inclusion on the Permitting Dashboard does not imply Federal endorsement of or support for the project or create a presumption that a covered project will be approved, favorably reviewed by any agency, or receive Federal funding. The inclusion of a project on the Permitting Dashboard may be reconsidered based on updated information related to, for example, a change in the scope of the Federal environmental review and authorization processes that apply to the project proposal.
*If you are interested in learning more about how to have a project covered under FAST-41, the Permitting Council Office of the Executive Director is available to engage in pre-application consultations. Email FAST.FortyOne@permitting.gov for more information.
- FAST-41 Covered Projects: Projects Identified as Covered Projects under Title 41 of the Fixing America’s Surface Transportation (FAST) Act
- Transparency Projects: Projects directed by the Executive Director of the Federal Permitting Improvement Steering Council to be posted on the Dashboard in the interests of transparency.
- DOT Projects: Department of Transportation (DOT) projects subject to Titles I, IX, and XI of the FAST Act
- Other Projects: Other projects tracked on the Permitting Dashboard
The full project data set and a pre-filtered report created from the full project data set is now available in the Permitting Dashboard Data Portal to download project and timeline information
Title | Agency | Sector | Status Sort descending | Category |
---|---|---|---|---|
Coos Bay, Oregon Section 408/204(f) Channel Modification | Department of the Army, US Army Corps of Engineers - Civil Works | Ports and Waterways, Port expansion or improvement undertakings or projects | Cancelled | Other Projects |
SR 187 (US 331) from SR10 (US90) to Alabama State Line | Florida | Surface Transportation, Highways | Cancelled | DOT Projects |
Interstate 90 Tolling (1306-EIS) | Department of Transportation, Federal Highway Administration | Surface Transportation, Highways | Cancelled | DOT Projects |
Jordan Cove LNG Terminal and Pacific Connector Gas Pipeline | Federal Energy Regulatory Commission | Pipelines, Liquefied Natural Gas Terminal Facilities (Onshore or in State Water), and associated Natural Gas Pipelines | Cancelled | FAST-41 Covered Projects |
R.C. Byrd | Federal Energy Regulatory Commission | Renewable Energy Production, Non-Federal Hydropower - Licenses (including Non-Federal Marine and Hydrokinetic Projects) | Cancelled | FAST-41 Covered Projects |
Lone Star Regional Rail Project - from San Antonio to Georgetown- TX | Department of Transportation, Federal Highway Administration | Surface Transportation, Railroads | Cancelled | DOT Projects |
Atlantic City International Airport Obstruction Removal for Runways 13-31 and 4-22, Environmental Assessment | Department of Transportation, Federal Aviation Administration | Aviation, Airport Development Projects (Aviation programs, commerce and safety, airport development and noise, financing, public airports) | Cancelled | DOT Projects |
Rio Vista Bridge Operation Overhaul | California, CalTrans | Surface Transportation, Bridges | Cancelled | DOT Projects |
Charlotte International Airport Environmental Impact Statement | Department of Transportation, Federal Aviation Administration | Aviation, Airport Development Projects (Aviation programs, commerce and safety, airport development and noise, financing, public airports) | Cancelled | DOT Projects |
US 51 I-39/90 - US 12/18 (Beltline); Stoughton - McFarland | Department of Transportation, Federal Highway Administration | Surface Transportation, Highways | Cancelled | DOT Projects |
Norfolk International Airport New Parallel Runway Development, Environmental Impact Statement | Department of Transportation, Federal Aviation Administration | Aviation, Airport Development Projects (Aviation programs, commerce and safety, airport development and noise, financing, public airports) | Cancelled | DOT Projects |
Washington Dulles International Airport (IAD) Z-Gates | Department of Transportation, Federal Aviation Administration | Aviation, Airport Development Projects (Aviation programs, commerce and safety, airport development and noise, financing, public airports) | Cancelled | DOT Projects |
Cedar Rapids Logistics Park in Iowa Project | Department of Transportation, Federal Railroad Administration | Surface Transportation, Railroads | Cancelled | DOT Projects |
Proposed Hotel Development at LaGuardia Airport, Environmental Assessment | Department of Transportation, Federal Aviation Administration | Aviation, Airport Development Projects (Aviation programs, commerce and safety, airport development and noise, financing, public airports) | Cancelled | DOT Projects |
South Padre Island 2nd Access | Texas | Surface Transportation, Highways | Cancelled | DOT Projects |
Dallas to Fort Worth Core Express Service | Department of Transportation, Federal Railroad Administration | Surface Transportation, Railroads | Cancelled | DOT Projects |
New York and New Jersey Harbor and Tributaries Study (HATS) | Department of the Army, US Army Corps of Engineers - Civil Works | Water Resources, Other Water Resource Projects (incl. Waste/Storm-water Infrastructure; Flood Risk Management; Navigation; Restoration activities associated with non-Bureau of Reclamation infrastructure) | Cancelled | Other Projects |
Destin-Fort Walton Beach Airport | Department of Transportation, Federal Aviation Administration | Aviation, Airport Development Projects (Aviation programs, commerce and safety, airport development and noise, financing, public airports) | Cancelled | DOT Projects |
Mineville Energy Storage Project | Federal Energy Regulatory Commission | Renewable Energy Production, Non-Federal Hydropower - Licenses (including Non-Federal Marine and Hydrokinetic Projects) | Cancelled | Other Projects |
Battle Born Solar Project | Department of the Interior, Bureau of Land Management | Renewable Energy Production, Solar | Cancelled | FAST-41 Covered Projects |