All Projects
It is important to note that a project’s inclusion on the Permitting Dashboard does not imply Federal endorsement of or support for the project or create a presumption that a covered project will be approved, favorably reviewed by any agency, or receive Federal funding. The inclusion of a project on the Permitting Dashboard may be reconsidered based on updated information related to, for example, a change in the scope of the Federal environmental review and authorization processes that apply to the project proposal.
*If you are interested in learning more about how to have a project covered under FAST-41, the Permitting Council Office of the Executive Director is available to engage in pre-application consultations. Email FAST.FortyOne@permitting.gov for more information.
- FAST-41 Covered Projects: Projects Identified as Covered Projects under Title 41 of the Fixing America’s Surface Transportation (FAST) Act
- Transparency Projects: Projects directed by the Executive Director of the Federal Permitting Improvement Steering Council to be posted on the Dashboard in the interests of transparency.
- DOT Projects: Department of Transportation (DOT) projects subject to Titles I, IX, and XI of the FAST Act
- Other Projects: Other projects tracked on the Permitting Dashboard
The full project data set and a pre-filtered report created from the full project data set is now available in the Permitting Dashboard Data Portal to download project and timeline information
Title | Agency Sort ascending | Sector | Status | Category |
---|---|---|---|---|
SM 101 HOV from South of Whipple Avenue to North I-380 | California, CalTrans | Surface Transportation, Highways | Complete | DOT Projects |
Ranchos Rehab | California, CalTrans | Surface Transportation, Highways | Complete | DOT Projects |
SBD 10 Express/HOV Lane Project | California, CalTrans | Surface Transportation, Roads | Complete | DOT Projects |
State Route (SR) 241 to SR 91 Direct Connector | California, CalTrans | Surface Transportation, Highways | Complete | DOT Projects |
RIV 215 NEW KELLER RD IC | California, CalTrans | Surface Transportation, Highways | In Progress | DOT Projects |
Lowell Hill Curves Realign roadway, improve curves, and widen shoulder widths | California, CalTrans | Surface Transportation, Highways | Complete | DOT Projects |
Napa Br. Sub-Structures/Scour: Bridge Preventive Maintenance | California, CalTrans | Surface Transportation, Highways | Cancelled | DOT Projects |
IMPROVE FREEWAY ACCESS & ARTERIAL CONNECTION TO I-605 | California, CalTrans | Surface Transportation, Highways | Complete | DOT Projects |
NORTH COUNTY CORRIDOR: CONSTRUCT EXPRESSWAY ON NEW ALIGNMENT | California, CalTrans | Surface Transportation, Highways | Complete | DOT Projects |
Port of Corpus Christi Authority Channel Deepening Project | Department of the Army, US Army Corps of Engineers - Regulatory | Ports and Waterways, Port expansion or improvement undertakings or projects | In Progress | FAST-41 Covered Projects |
Mid-Breton Sediment Diversion | Department of the Army, US Army Corps of Engineers - Regulatory | Water Resources, Other Water Resource Projects (incl. Waste/Storm-water Infrastructure; Flood Risk Management; Navigation; Restoration activities associated with non-Bureau of Reclamation infrastructure) | In Progress | FAST-41 Covered Projects |
Surry-Skiffes Creek-Whealton Aerial Transmission Line | Department of the Army, US Army Corps of Engineers - Regulatory | Electricity Transmission, Electricity Transmission (all) | In Progress | Other Projects |
Dow Chemical Company's Harris Reservoir Expansion EIS | Department of the Army, US Army Corps of Engineers - Regulatory | Water Resources, Irrigation and related water supply projects | Complete | Other Projects |
Sparrows Point Container Terminal | Department of the Army, US Army Corps of Engineers - Regulatory | Ports and Waterways | In Progress | FAST-41 Covered Projects |
US 275 West Point to Scribner | Department of the Army, US Army Corps of Engineers - Regulatory | Surface Transportation, Highways | Paused | Other Projects |
Mid-Barataria Sediment Diversion | Department of the Army, US Army Corps of Engineers - Regulatory | Water Resources, Other Water Resource Projects (incl. Waste/Storm-water Infrastructure; Flood Risk Management; Navigation; Restoration activities associated with non-Bureau of Reclamation infrastructure) | Complete | FAST-41 Covered Projects |
West Bank and Vicinity, Louisiana General Re-evaluation Report | Department of the Army, US Army Corps of Engineers - Civil Works | Water Resources, Other Water Resource Projects (incl. Waste/Storm-water Infrastructure; Flood Risk Management; Navigation; Restoration activities associated with non-Bureau of Reclamation infrastructure) | Complete | Other Projects |
Amite River and Tributaries-East of the Mississippi River, Louisiana, Flood Risk Management Feasibility Study | Department of the Army, US Army Corps of Engineers - Civil Works | Water Resources, Other Water Resource Projects (incl. Waste/Storm-water Infrastructure; Flood Risk Management; Navigation; Restoration activities associated with non-Bureau of Reclamation infrastructure) | Class of Action Changed | Other Projects |
Miami-Dade County Back-Bay Coastal Storm Risk Management Project | Department of the Army, US Army Corps of Engineers - Civil Works | Water Resources, Other Water Resource Projects (incl. Waste/Storm-water Infrastructure; Flood Risk Management; Navigation; Restoration activities associated with non-Bureau of Reclamation infrastructure) | Class of Action Changed | Other Projects |
Nassau County Back Bays Coastal Storm Risk Management Feasibility Study | Department of the Army, US Army Corps of Engineers - Civil Works | Water Resources, Other Water Resource Projects (incl. Waste/Storm-water Infrastructure; Flood Risk Management; Navigation; Restoration activities associated with non-Bureau of Reclamation infrastructure) | In Progress | Other Projects |