FAST-41 Covered Projects
It is important to note that a project’s inclusion on the Permitting Dashboard does not imply Federal endorsement of or support for the project or create a presumption that a covered project will be approved, favorably reviewed by any agency, or receive Federal funding. The inclusion of a project on the Permitting Dashboard may be reconsidered based on updated information related to, for example, a change in the scope of the Federal environmental review and authorization processes that apply to the project proposal.
*If you are interested in learning more about how to have a project covered under FAST-41, the Permitting Council Office of the Executive Director encourages you to engage with their office in pre-application consultations. Email FAST-41@permitting.gov for more information. To learn more about Fast-41 covered projects, please visit the Permitting Council’s new website at permitting.gov.
Classifications of projects that are contained within the Federal Infrastructure Permitting Dashboard:
- FAST-41 Covered Projects: Projects Identified as Covered Projects under Title 41 of the Fixing America’s Surface Transportation (FAST) Act
- FAST-41 Transparency Projects: Projects directed by the Executive Director of the Federal Permitting Improvement Steering Council to be posted on the Dashboard in the interests of transparency.
- DOT Projects: Department of Transportation (DOT) projects subject to Titles I, IX, and XI of the FAST Act
- Other Projects: Other projects tracked on the Permitting Dashboard
The full project data set and a pre-filtered report created from the full project data set is now available in the Permitting Dashboard Data Portal to download project and timeline information.
The infrastructure projects below are identified as Covered Projects under Title 41 of the Fixing America’s Surface Transportation (FAST) Act.
| Title | Agency | Sector | Status |
|---|---|---|---|
| Santee Sioux Tribe Water Capacity and Infrastructure Improvements | Department of the Army, US Army Corps of Engineers - Regulatory | Water Resources | In Progress |
| Seminoe Pumped Storage Project | Federal Energy Regulatory Commission | Energy Storage | In Progress |
| Silver Rock Transmission Project | Department of the Interior, Bureau of Land Management | Electricity Transmission | In Progress |
| Silver Star Solar | Department of the Interior, Bureau of Land Management | Renewable Energy Production, Solar | In Progress |
| Skipjack Wind Farm | Department of the Interior, Bureau of Ocean Energy Management | Renewable Energy Production, Wind: Federal Offshore | Cancelled |
| South Bennett Solar | Department of the Interior, Bureau of Land Management | Renewable Energy Production, Solar | Cancelled |
| South Fork Wind Farm and South Fork Export Cable | Department of the Interior, Bureau of Ocean Energy Management | Renewable Energy Production, Wind: Federal Offshore | Complete |
| South Fort Meade – South of SR 64 Parcels | Department of the Army, US Army Corps of Engineers - Regulatory | Mining | In Progress |
| South Railroad Mine Project | Department of the Interior, Bureau of Land Management | Mining | Complete |
| South System Expansion 4 | Federal Energy Regulatory Commission | Pipelines, Interstate Natural Gas Pipelines | In Progress |
| South32 Hermosa Critical Minerals Project | Department of Agriculture, US Forest Service | Mining | Complete |
| SouthCoast Wind Energy LLC (SouthCoast Wind) | Department of the Interior, Bureau of Ocean Energy Management | Renewable Energy Production, Wind: Federal Offshore | In Progress |
| Sparrows Point Container Terminal | Department of the Army, US Army Corps of Engineers - Regulatory | Ports and Waterways | Complete |
| Stagecoach Wind | Department of the Interior, Bureau of Land Management | Renewable Energy Production, Wind: Other than Federal Offshore | Cancelled |
| Sunrise Wind Farm | Department of the Interior, Bureau of Ocean Energy Management | Renewable Energy Production, Wind: Federal Offshore | Complete |
| SunZia Southwest Transmission Project | Department of the Interior, Bureau of Land Management | Electricity Transmission, Electricity Transmission (all) | Complete |
| Swan Lake North Pumped Storage | Federal Energy Regulatory Commission | Renewable Energy Production, Non-Federal Hydropower - Licenses (including Non-Federal Marine and Hydrokinetic Projects) | Complete |
| Ten West Link | Department of the Interior, Bureau of Land Management | Electricity Transmission, Electricity Transmission (all) | Complete |
| Tennessee Gas Abandonment and Capacity Restoration | Federal Energy Regulatory Commission | Pipelines, Interstate Natural Gas Pipelines | Cancelled |
| Texas Gateway Project | Federal Energy Regulatory Commission | Pipelines, Interstate Natural Gas Pipelines | In Progress |